







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Remodeling Across Pinewood
Home remodeling in Pinewood starts with a written price, not a guess. A typical kitchen remodel here runs $14,000 – $45,000, a bathroom $9,000 – $28,000, and a home addition $45,000 – $130,000. Those ranges reflect what we actually see on Pinewood jobs, where slab-on-grade block homes with interior furring strips mean the real cost drivers hide behind the walls. Call (803) 680-2547 for a free estimate, and we’ll walk the project with you before any numbers get locked.
We work Pinewood streets every week, from the blocks off NW 79th Street up toward NW 103rd Street. We know the 33147 zip code, the older ranch-style homes, and the two- and three-bedroom block houses that make up most of the stock here. When you call, a live person answers. When we show up, your technician’s name and photo were sent to you before the doorbell rang. That is how Home Remodeling should work in a neighborhood where you answer the door for a stranger.
Why Mason Remodeling Is Pinewood’s Preferred Home Remodeling Company

Mason Remodeling has been running construction projects since 2004, and Isaac Pruett leads our crews on the ground. We are part of the Threshold Group family of home-service companies, and every location holds to the Threshold Standard: background-checked, identity-verified techs in clean marked uniforms, with a photo ID badge at the door. You get the name and photo of every person coming to your Pinewood home before they arrive. That is not a perk. It is the rule.
Pinewood homeowners tell us the same thing: the written price matters more than the pitch. We give you a line-item price before work starts, on every project, every time. No verbal estimate that grows on the final bill. If the work is not right within 365 days of completion, we make it right at no cost to you. That is the 365-Day Done Right Promise, and it is written into the guarantee on every contract.
Isaac Pruett has walked enough Pinewood remodels to know what to look for before pricing. The home might be a 1950s block ranch or a 1970s frame addition. The furring strips might hold cabinets, or they might be rotten behind the tile. Those details change the scope, and we confirm them before we quote. You will not get a surprise change order from us because we did not open a wall first.
Styles & brands we work with







Home Renovation in Pinewood
Home renovation in Pinewood means tearing out what is worn and rebuilding it to last in south Florida’s heat and humidity. We are not talking about a coat of paint. We’re talking about moving plumbing through a slab, re-framing a load-bearing wall, and setting cabinets on walls that were never built like a modern frame house. Most Pinewood renovations touch kitchens, baths, or both, and the cost typically lands between $9,000 for a small bath and $45,000 for a full kitchen.
Scoping the Slab and the Furring
The single biggest difference between Pinewood and most Florida suburbs is what sits behind the drywall. Many homes here are concrete block with wood furring strips nailed to the interior face. That changes everything: cabinet mounting, tile backing, electrical runs, and where a drain can physically go. We confirm the slab plumbing layout before we quote. A bid that skips that step is a bid that will change.
Load-Bearing Openings and Headers
Opening a wall between a Pinewood kitchen and living room is a common request. On a block home, that wall might be carrying roof load, or it might be non-structural furring over block. We check before we cut. If it is load-bearing, we size a proper header, pull the permit, and call for the required inspection. The cost for that structural work is part of the written price, not a surprise after demo.
Home Remodeling Companies in Pinewood

Home remodeling companies in Pinewood are not all the same. The difference shows up in the contract, not the brochure. Some write allowances so loose that the quoted kitchen price seems to cover Cambria or Caesarstone, only to find the allowance buys builder-grade laminate. We write the actual product into the quote. If you choose Cambria, the price says Cambria. If you choose Silestone, it says Silestone. You know before we start.
Draw Schedules Tied to Inspections
In Pinewood, a fair draw schedule is tied to inspection sign-off, not to a calendar. You should not pay for finished surfaces before the rough-in and framing have passed inspection. We structure draws so your money moves when the work is verified by the building department, not when a crew member asks for it.
The Written Price, Start to Finish
Before we demo a single cabinet in Pinewood, you have a written line-item price. That includes the permit fees, the dumpster, the rough-in, the finishes, and the cleanup. If something changes mid-project because you pick a different tile or add an outlet, we write a change order and you approve it before that work starts. Nothing happens on the job site that you did not see in writing first.
Trusted Brands We Service in Pinewood
We install and service the brands Pinewood homeowners actually ask for. KraftMaid and Wellborn for cabinetry. Cambria, Silestone, and Caesarstone for counters. Kohler, Moen, and Toto for fixtures. We have also worked with prefab and panelized systems from Abodu, Cover, Dvele, and Mighty Buildings on Pinewood additions and ADU-style projects, where the build happens off-site and the site work is the real schedule driver. When you need parts or a replacement during a project, our suppliers stock what we need locally, so a missing fixture does not stall the job for two weeks.
See the difference
Before
After
Before
After
Before
AfterCommon Home Remodeling Problems We See in Pinewood Homes
- Furring-strip walls treated like frame walls. A cabinet installer who has never worked Pinewood block homes will drive screws into furring strips and call it done. Over time, those cabinets sag. We sister blocking into the block or mount through to the masonry when we set cabinets here.
- Slab plumbing surprises after demo. The sink drain might run through the slab, not the wall. If the bid assumed a wall rough-in, moving that drain becomes a change order. We look for this before we price, not after we open the floor.
- Moisture and humidity in wall cavities. South Florida humidity finds its way into unconditioned spaces, and Pinewood block homes hold moisture differently than frame houses. We check for rot on furring strips and sill plates before closing any wall, because closing over wet wood is a guaranteed callback.
- Loose allowances on finish materials. A quote that says “countertop allowance” without a specific product is a quote that will grow. We write the actual brand and color line into the contract so the finished job matches the finished price.
Pricing for Home Remodeling in Pinewood, FL
Pinewood sits in a pocket of Florida where the same remodel can swing thousands of dollars based on how the home was built. Slab-on-grade block homes with interior furring strips hide plumbing chases differently than frame houses, so our scope of work always starts by confirming what is behind the walls before we price anything. In many neighboring cities, that same job is a straightforward tear-out with no surprises.
| Project | Typical Pinewood Range |
|---|---|
| Kitchen Remodel | $14,000 – $45,000 |
| Small Kitchen Remodel | $9,000 – $20,000 |
| Bathroom Remodel | $9,000 – $28,000 |
| Small Bathroom Remodel | $5,000 – $12,000 |
| Cabinet Installation | $4,000 – $13,000 |
| Countertop Installation | $2,000 – $6,500 |
| Backsplash Installation | $800 – $2,500 |
| Kitchen Island Installation | $3,000 – $10,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Shower Replacement | $3,000 – $8,500 |
| Bathroom Vanity Installation | $800 – $3,000 |
| Home Addition | $45,000 – $130,000 |
| Garage Conversion | $30,000 – $80,000 |
What moves the price on a Pinewood remodel? Whether the slab plumbing has to move, whether a wall is load-bearing, and what finish grade you pick. A KraftMaid kitchen costs more than stock cabinets, and Cambria costs more than laminate. We show you all of that in the written quote. Call (803) 680-2547 to schedule your free estimate.
We Also Serve Cities Near Pinewood
Our crews work Pinewood daily, and we also cover Home Remodeling in Pinewood for clients across the surrounding area, including Miami, Hialeah, Miami Gardens, and Homestead. If you’re in one of those cities and need a pinewood-caliber written price, the same Threshold Standard applies.
Serving Pinewood, FL - Our Local Coverage Area
We’re based in the Pinewood area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs About Home Remodeling in Pinewood
A Pinewood home remodel includes a written price, a permit (when required), demolition, rough-in work for plumbing and electrical, the finished surfaces and fixtures, a punch-list walkthrough, and a final inspection sign-off. It starts with a site visit to confirm what is behind the walls, because Pinewood block-and-furring homes hide plumbing and structural realities that a drive-by bid will miss. You get the written price before any work starts. Call (803) 680-2547 for an exact quote.
A full kitchen remodel in Pinewood runs $14,000 – $45,000, and a small kitchen remodel runs $9,000 – $20,000. The range depends on whether you are moving plumbing through the slab, whether a wall is load-bearing, and what cabinetry and countertop brands you choose. We write the actual product into the price, so a Cambria counter is priced as Cambria, not as a mystery allowance. Call (803) 680-2547 for a free estimate.
Yes, most bathroom remodels in Pinewood require a permit when you are moving plumbing, altering the drain line, or changing electrical circuits. We pull the permit for you, schedule the inspections, and hold the draw schedule to inspection sign-off. You should not pay for finished tile before the rough-in passes inspection. Call (803) 680-2547 to talk through your specific bathroom scope.
A draw schedule is the payment timeline tied to specific milestones in your remodel. On a Pinewood job, the right draw schedule is tied to inspection sign-off, not to dates on a calendar. You pay for the rough-in when it passes inspection, not before. You pay for finished surfaces when they are installed and verified, not when a crew member asks. That structure protects you from paying for work that has not been inspected. Call (803) 680-2547 if you want to see a sample draw schedule.
A small bathroom in Pinewood typically takes 2 – 3 weeks, a full kitchen 4 – 8 weeks, and a home addition 3 – 6 months. The timeline changes most when a wall is load-bearing and needs a new header, when slab plumbing has to move, or when a product is backordered. We built a 1970s galley kitchen off Pinewood Drive where the original cabinets had been screwed into furring strips over block and the sink drain ran through the slab, not the wall. We confirmed the layout after opening the soffit, re-set the load-bearing pass-through with a proper header, moved the Kohler sink rough-in, and finished with KraftMaid cabinets and a Silestone counter. The homeowner got a punch-list walkthrough before final inspection sign-off. That is how a Pinewood remodel should run. Call (803) 680-2547 to schedule your free estimate.
Written by Isaac Pruett, Owner at Mason Remodeling, serving Pinewood since 2004.










