







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Ameristar Fence Installation: The Los Angeles Owner’s Guide
If you’ve got a failed Ameristar fence component somewhere on your property, here’s the short version: we stock Ameristar-compatible replacement parts on our trucks, we install them across Los Angeles, and a typical Ameristar fence installation runs $4,130 to $10,620 depending on footage, post condition, and site access. Most repairs we quote are done in a single day, and we carry the common pickets, rails, posts, and gate hardware that keep an Ameristar system looking right. What usually brings a homeowner to this page is a sagging gate, a popped rail bracket, or a wind-bent picket row someone’s been meaning to deal with for six months. We get it. That fence is doing real work, and once a structural part goes, the failure spreads.
Key Takeaways
- Ameristar fence installation in Los Angeles runs $4,130 – $10,620 for a full line or section replacement, parts and labor included.
- We stock OEM Ameristar-compatible pickets, rails, posts, gate frames, and hardware on the truck.
- The most common Los Angeles failure we see is wind-loosened rail brackets and salt-air corrosion on coastal steel.
- Mason Remodeling is an independent service provider, not affiliated with Ameristar, but we install and match their product lines daily.
- A live person answers our phone 24/7. No call trees. Call (803) 680-2547.
Styles & brands we work with







Which Ameristar Models This Applies To
Ameristar builds its fence systems around three residential lines you’ll see all over Los Angeles: Montage (their ornamental steel line, often spec’d for HOA front yards in places like Encino and Sherman Oaks), Echelon (a heavier-gauge steel line with a cleaner, more industrial look common in hillside properties), and Classic (the budget-friendly steel option you’ll find in a lot of San Fernando Valley backyards). The compatibility gotcha is this: Montage rails come in 6-foot and 8-foot punched lengths, and the rail punch pattern is not interchangeable with Echelon. If you buy a replacement rail online without checking the series stamped on the end cap, you’ll end up with a rail that won’t accept your existing pickets. We see it weekly.
Identifying your part is straightforward if you know where to look. Posts have the series name stamped on the cap or near the bottom flange. Rails have a small label inside the open end or a stamped code near the bracket slots. Pickets are easier: measure the width and the punched-hole spacing. Montage pickets run ⅝” wide with a punched tab top; Echelon runs 1″ wide with a squared top. If you’re comparing OEM to aftermarket, our honest take after years of both: Ameristar’s powder coat is thicker than most aftermarket equivalents, which matters in a city where marine layer fog and UV tag-team steel. For structural parts like posts and rails, we recommend OEM. For pickets and brackets, quality aftermarket pieces from our partners handle Los Angeles conditions fine and shave about 20% off the parts line.
Signs Your Ameristar Fence Installation Is Failing
- The gate drags or won’t latch. In hillside Los Angeles neighborhoods, posts shift over a few wet winters and throw the gate frame out of square. The hinge post is usually the culprit, not the gate itself.
- Pickets rattle when the Santa Anas kick up. That rattle means the bottom rail clips have fatigued, and once one picket loosens, the rest in that section start working loose against the rail.
- Rust streaking below the post caps. Coastal moisture and sprinkler overspray eat the powder coat from the inside out. By the time you see the streak, the post wall has usually begun thinning at ground level.
- Rail brackets pop loose after a hard gust. Ameristar’s bracket system is strong, but repeated wind loading from the passes will gradually work the screws out of post anchors, especially on long unsupported runs.
- A section leans, even slightly. That lean almost always means the concrete footing has cracked from ground movement, a reality in Los Angeles where expansive clay soil shifts between drought years and El Niño winters.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
For a full Ameristar fence installation in Los Angeles, plan on $4,130 to $10,620. The biggest driver in that range is linear footage and what’s left of the existing posts. If the posts are sound, we’re looking at the lower end: rails, pickets, brackets, installation, haul-away. If the posts are rusted or leaning, we’re at the higher end because new concrete footings take a day to set before the rail carries load. Site access matters, too. A backyard with a 32-inch side gate and no equipment path costs more in labor than a front yard we can work straight off the truck. Every line item goes on paper before we start. You’ll know what the parts cost, what the labor costs, and what the haul-away costs. No change orders, no “we found more when we opened it up” surprise. And if the work isn’t right, our 365-Day Done Right Promise puts us back on-site at no cost to you. Call (803) 680-2547 and we’ll write the number up the same day.
DIY or Call Us?
You can absolutely check your posts for rust at ground level, confirm which series your fence is by reading the stamped labels, and take photos of the failed part before you call for pricing. Those three steps save everyone a trip back to the truck. What you shouldn’t do is pull a post out of concrete and try to set a new one in an afternoon. A fence post in Los Angeles clay needs a proper footing, and a post that’s set too shallow will be leaning into your neighbor’s yard by spring. Gate springs and tension components on Ameristar’s hardware are under meaningful load when the gate’s closed; if one lets go while you’re working the hinge, you’ll catch it somewhere you don’t want to catch it. We send our crews out with the right size auger, the right mix, and the right respect for the fence line. If you’d rather watch than dig, call (803) 680-2547 for a free estimate.
FAQs
A properly installed Ameristar steel fence in Los Angeles lasts 20 to 25 years before the posts need serious attention, with pickets and rails holding up well beyond that if they’re not sitting in sprinkler overspray. Coastal properties near the water run closer to 15 years on posts. Call (803) 680-2547 if you want us to walk your fence line and tell you what’s actually left in it.
Yes, in most cases a single section can be spliced or re-secured without replacing the whole line, as long as the posts on either side are still solid. We’ll tell you honestly if the posts are too far gone to make a repair worthwhile. Call us at (803) 680-2547 and we’ll give you the straight answer before any work gets scheduled.
A straight section replacement with healthy posts takes our crew about four to six hours. If we’re digging new post footings, that stretches to two days because the concrete needs a day to cure before rails hang. Weather rarely slows us down in Los Angeles, so the timeline mostly comes down to footing work.
We keep common Montage and Echelon pickets, rails, post caps, and gate hardware on the truck when we roll out for a fence call. Obscure or long-run custom pieces get ordered and arrive within a few business days, and we’ll tell you which scenario you’re in before we schedule. We also stock parts lines for KraftMaid, Cambria, and Silestone if you’ve got other projects on your list.
Written by Isaac Pruett, Owner, Mason Remodeling at Mason Remodeling, serving Los Angeles and nearby areas.


