5 Mistakes to Avoid With General Contractor
Most homeowners think the riskiest part of a remodel is the demo day. It’s not. The five mistakes that cost Los Angeles homeowners the most money happen in the 72 hours before work begins: accepting a price range instead of a fixed number, skipping crew verification, assuming your general contractor’s license covers everyone on site, approving verbal change orders, and letting work start before permits are approved. Fix these five things and you’ve eliminated maybe 80% of what goes wrong on a typical project. If you’d rather not go it alone, call Mason Remodeling at (803) 680-2547 and we’ll walk you through all five before you sign anything.
Key Takeaways
- Never sign a contract with a “price range” or “not to exceed” clause – get one fixed number in writing before work begins.
- Verify every person entering your home by name, photo, and background check status before they arrive.
- In California, subcontractors need their own licenses and insurance – your GC’s paper does not cover them.
- Verbal change orders are the single biggest source of billing disputes in Los Angeles remodeling.
- Permits must be pulled and posted before the first tool comes off the truck – not after.
Mistake #1: Signing a Contract With a “Price Range” Instead of a Fixed Price
A contract that says “estimated cost: $45,000 – $62,000” is not a price. It’s a starting point for negotiation that will, every single time, end at the high number or above. We see this constantly in Los Angeles, where homeowners sign an “estimate” thinking it’s a quote and discover on week three that materials, labor, and “unforeseen conditions” have pushed the final number thousands past what they planned for.
What actually protects you is a written line-item price, delivered before work starts, where every cost is spelled out: demolition, framing, plumbing rough-in, electrical, drywall, tile, finish work. You should see the price for each line, not just a lump sum at the bottom. That way, when something changes, you both know exactly what the change costs, and there’s no room for a “reasonable interpretation” that balloons your bill.
What to replace “not to exceed” with: a fixed-price contract for the defined scope, plus a written change order process for anything outside that scope. If a contractor says they can’t give you a fixed price because “you never know what’s behind the walls,” that’s a red flag. A good general contractor in Los Angeles has opened enough walls in enough neighborhoods – from Hancock Park Victorians to 1970s Encino ranches – to know what’s back there and price it accordingly.
And “not to exceed” language? It doesn’t cap anything. It’s a ceiling with a skylight. If your contractor underestimated the tile, you pay for more tile. If their labor rate was wrong, you pay the difference. You get all the risk with none of the protection. A better approach: ask for fixed overhead and profit, with material prices locked in writing before the job starts.
Mistake #2: Skipping the Crew Authorization Step

You hired a general contractor. You vetted them, checked their license, read their reviews. But have you vetted the person who’s going to be in your kitchen at 10 a.m. on a Tuesday while your kids are at school? Most homeowners haven’t, and in Los Angeles, where so many of us live in single-family homes and tight-knit neighborhoods, that’s a missed step with real consequences.
Every person who enters your home for a remodel should be identified before they arrive. We send homeowners the name and photo of every crew member ahead of the job. On arrival, each technician wears a photo ID badge and a clean, marked uniform. No badge, no entry. That’s the standard at Mason Remodeling, and it’s a policy we call The Threshold Standard – every technician is background-checked, identity-verified, and introduced to you by name and photo before they walk through the door.
Why does this matter beyond comfort? Because if an unverified worker damages your home or worse, your general contractor’s insurance may not cover the loss, and your homeowner’s insurance may push back on a claim involving someone whose identity was never documented. You’re opening your home to strangers. That’s a safety decision, not a formality. Ask your contractor: “Who is coming to my house, and how will I know they’re the person you cleared?” If they stumble on that answer, find another contractor.
What you should see before day one:
- Names and photos of every crew member.
- Confirmation of background checks and identity verification.
- A clear uniform or vehicle description so you can spot them from the driveway.
- A photo ID badge at the door, shown to you before they step inside.
We’ve handled hundreds of projects across Los Angeles, and I can count on one hand the number of homeowners who asked about crew verification before they hired us. It’s the question nobody asks, and it’s the one that matters most to the person home alone during a six-week bath remodel.
Mistake #3: Assuming Your General Contractor’s License Covers the Subcontractors
In California, a general contractor’s license does not cover the electrician, the plumber, the tile installer, or the roofer they bring onto your Los Angeles job site. Each subcontractor who performs work over $500 in labor and materials must carry their own contractor’s license from the Contractors State License Board. They must also carry their own worker’s compensation insurance and general liability insurance. If they don’t, and something goes wrong, the homeowner – not the GC – is the one left holding the liability.
This is the part of the pre-project window that Los Angeles homeowners skip almost universally. They check the GC’s license, see it’s active, and stop there. Then the unlicensed subcontractor gets hurt on the job, files a claim against the homeowner’s policy, and the homeowner discovers their own insurance has an exclusion for unlicensed contractors. It’s not a rare outcome. It happens enough that the CSLB has an entire page on it.
What to ask before you sign:
- “Will you provide a list of every subcontractor with their license numbers?”
- “Can you confirm each sub carries their own workers’ comp and general liability?”
- “Are your subcontractors vetted through the same background-check process as your own crew?”
At Mason Remodeling, we run every subcontractor through the same identity-verification and background-check process we run on our own team, and we provide license and insurance documentation on request. We also use specification-grade material partners – our general contracting work in Los Angeles leans on brands like James Hardie siding, Cambria and Silestone surfaces, and Kohler and Moen plumbing fixtures – so the materials have their own warranties, independent of the labor. But the labor still has to be licensed. Your contract should say so.
Mistake #4: Approving Verbal Change Orders

A change order is any change to the original scope: “Can we move this wall back six inches?” “I want the shower niche deeper.” “Actually, let’s do heated floors.” In Los Angeles, these conversations happen constantly on job sites. The homeowner asks. The contractor says, “Sure, no problem.” Nobody writes anything down. Eight weeks later, there’s a $14,000 line item on the final bill for work the homeowner thought was a small favor.
Verbal change orders are the single most common source of billing disputes in home remodeling. And in California, where oral contracts can sometimes be enforced, the ambiguity cuts against the homeowner. If you didn’t get it in writing, you have little leverage when the bill arrives.
The fix takes two sentences. Ask your contractor to add this policy to the contract:
“Any change to the scope of work described in this agreement must be documented in a written change order, signed by both the homeowner and the contractor, before the changed work begins. No verbal agreement shall modify the scope of work or the contract price.”
That’s it. Two sentences. If your contractor hesitates on this, that’s a red flag. A contractor who plans to be honest about change orders will welcome the paperwork because it protects them too. At Mason Remodeling, our change order process is simple: we write it, you read it, you sign it, we do it. You’ll never see a line item you didn’t approve in writing. Every project completed – from whole-home remodels in Los Angeles to a single bathroom – comes with a written price before work starts and written change orders throughout. That’s not a favor. It’s the only way to run a job without drama.
Mistake #5: Starting Work Before Permits Are Pulled
Some contractors in Los Angeles will tell you they can start the demo immediately and “take care of permits later.” That’s the moment you should stop the conversation and find someone else. When work begins before permits are approved, the homeowner – not the contractor – is the one who owns the liability for unpermitted work. If the city finds out, you’re the one paying fines, tearing out finished work, and dealing with a stop-work order. Not the contractor who told you it would be fine.
Permits exist because building codes exist, and building codes exist because California has earthquakes, and Los Angeles building standards are written in response to real seismic risk. A wall that’s opened up for plumbing or electrical work has to meet current code before it’s closed back up. If the inspector never sees it, you’re the one exposed if something fails later – and your homeowner’s insurance may have language that limits coverage for unpermitted work.
What to ask before you sign:
- “Which permits does this project require, and when will they be pulled?”
- “Will permit fees be itemized in the contract?”
- “Will inspections be scheduled and passed before the walls are closed up?”
We pull permits on every Los Angeles bathroom remodeling project that requires them, and we schedule inspections before any work gets covered. Inspections passed, permits signed off, then we move to the next phase. That’s the sequence, every time. If a contractor tells you permits are “optional” or “just a city money grab,” they’re telling you they don’t want an inspector looking at their work. Walk away.
When to Call a Pro

All five of these mistakes are preventable by a homeowner who knows what to ask, but knowing what to ask only works if you have a contractor who answers straight. If the contractor you’re considering dodges any of the questions above – license numbers for subs, crew verification, written change orders, permit timing – you’re not negotiating. You’re being managed. That’s the moment to bring in a professional who does this every day.
If you’re planning a general contractor project in Los Angeles, a bathroom, or a whole-home remodel, we’ll give you a written price before work starts, provide names and photos of everyone who will enter your home, and back the finished work with our Done Right Promise. If something isn’t right within a year of completion, we make it right at no cost to you.
Related services: Bathroom Remodeling in Los Angeles | Home Remodeling in Los Angeles
The Bottom Line
The most expensive contractor mistakes aren’t made during the project. They’re made in the 72 hours before it starts, when you’re reviewing contracts, scope, and crew. Get the price fixed in writing. Verify every person who will enter your home. Check the licenses and insurance of every subcontractor. Refuse verbal change orders. And never let work begin before permits are pulled and posted. Do those five things and you’ve removed most of the risk from your remodel before the first hammer swings.
If you’re in Los Angeles and need help, Mason Remodeling offers free estimates. Call Mason Remodeling at (803) 680-2547 and we’ll walk you through every one of these steps before you commit to anything.
Frequently Asked Questions
In Los Angeles, you can expect general contracting fees to run 10% to 20% of the total project cost, so on a $75,000 bathroom remodel, the GC fee is typically $7,500 to $15,000. That’s separate from materials and subcontractor labor. The best way to avoid surprises is a fixed-price contract with line-item costs spelled out before work begins. Call (803) 680-2547 for an exact quote on your project – estimates are free.
Check the Contractors State License Board website at cslb.ca.gov, enter the contractor’s name or license number, and confirm the license is active, the classifications match the work being done, and there are no outstanding complaints or disciplinary actions. Then verify that every subcontractor on the job has their own active license too. California requires it for any sub performing work over $500.
A remodeling contract should include a fixed price with line-item costs, a defined scope of work, the names and license numbers of all subcontractors, a written change order process, permit responsibility and timeline, a payment schedule tied to completed work, and a written guarantee with specific coverage dates. If any of these are missing, the contract protects the contractor more than you.
Only if the scope changes, and that change must be documented in a written change order signed by both parties before the new work begins. At Mason Remodeling, we deliver a written price before any work starts, and anything outside that defined scope requires a signed change order before we proceed. No surprise invoices at the end. Call (803) 680-2547 to schedule your free estimate and get a written price before you commit.
Written by the team at Mason Remodeling.