







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Bathroom Remodeling in Hialeah Gardens Costs $9,000 – $28,000, Depending on Scope
A full bathroom remodel in Hialeah Gardens typically runs $9,000 – $28,000, with walk-in shower installations starting around $4,500 and small bathroom remodels landing between $5,000 and $12,000. The biggest cost driver in this city is what’s under the slab, not what’s on top of it. Our Bathroom Remodeling team scopes every project with a camera inspection of the drain line before we ever write the price, because Hialeah Gardens homes built between the 1970s and 1990s have a habit of hiding corroded cast iron under the tile.
Fast, Reliable Bathroom Remodeling Across Hialeah Gardens

If you live anywhere from West 68th Street down to Okeechobee Road, or over by Hialeah Gardens Boulevard near the Gratigny Parkway, you’ve probably seen our crews at work. We know Hialeah Gardens homes because we’ve opened enough of them up to know what waits behind the drywall. Slab-on-grade foundations, original cast-iron waste lines, and the occasional surprise root intrusion from the city’s older landscaping. We plan for it before we quote, not after we demo. That’s why our written price is delivered before any tool leaves the truck. Call (803) 680-2547 and a live person answers. No phone tree, no callback wait.
We serve every part of Hialeah Gardens, including the neighborhoods around Westland Mall, the residential streets off NW 103rd Street, and the homes clustered near the Turnpike interchange. Local work means we’re never far when an inspection needs to be met or a material run needs to happen same day.
Styles & brands we work with







Why Mason Remodeling Is Hialeah Gardens’s Preferred Bathroom Remodeling Company
Homeowners in Hialeah Gardens keep calling us back for one reason: the price we write is the price we honor. That matters in a city where the average home was built decades ago and remodelers routinely hit surprise conditions once the tile comes up. We don’t play that game. Every project gets a documented, line-item written price before work begins. If we find corroded drain pipe under your slab, we stop, show you the camera footage, and price the repair as a change order. You approve it in writing before we touch it. Isaac Pruett, who leads Mason Remodeling, built our process around that discipline, and our crews follow it on every Hialeah Gardens job.
Every crew member who arrives at your door is background-checked and identity-verified through The Threshold Standard. You get the technician’s name and photo before the visit. At the door, they show a photo ID badge and wear a clean, marked uniform. If you’re home alone, or you’ve got kids in the house, that matters. It’s not a courtesy. It’s a system we’ve run since 2004 as part of the Threshold Group family of home-service companies.
Our written guarantee covers every completed project for 365 days from the completion date, with terms stated plainly: what’s covered, what’s excluded, and for how long. If something fails, we return for a free second visit. No dispute process, no conditions.
Walk In Shower in Hialeah Gardens

A walk in shower in Hialeah Gardens is the single most requested bathroom upgrade we install, especially in the older slab homes east of the Turnpike. Homeowners want the tub gone and a curbless or low-curb shower in its place, with tile running to the ceiling and a bench if the footprint allows. In Hialeah Gardens, walk-in shower installation runs $4,500 – $12,000, depending on whether we’re working with an existing footprint or moving drains and building a new pan.
What Changes the Price
Moving the shower drain on a slab costs more than keeping it in place. If the original cast-iron line is shot, which happens often in Hialeah Gardens, the slab saw-cut and drain replacement becomes a documented change order, not a buried fee. Glass enclosures, custom tile layouts, and plumbing fixture upgrades push the number toward the top of the range.
What Our Crew Does First
We camera-scope the drain line before quoting. On a 1980s slab-on-grade home off West 68th Street near Hialeah Gardens Boulevard, our crew tore out a failing tub surround and found the original cast-iron drain had corroded through at the trap. We pulled the subfloor section, replaced the drain run to the stack, passed the rough-in inspection, then set a Kohler shower pan and a KraftMaid vanity. That finished walk-in shower came in near the middle of our $4,500 – $12,000 range because the slab repair was documented as a change order before tile went back down.
Bathroom Remodeling Companies in Hialeah Gardens
Bathroom remodeling companies in Hialeah Gardens all bid the pretty stuff: the tile, the glass, the vanity. Very few scope the plumbing under the slab, and that’s the difference between a quote that holds and one that balloons. We approach every Hialeah Gardens bathroom as a possible rough-in repair, because the city’s shallow water table and aging residential drain lines make it a real probability. Full bathroom remodels in Hialeah Gardens run $9,000 – $28,000. Small bathrooms run $5,000 – $12,000. We give you a written price upfront, with allowances for tile, fixtures, and vanities spelled out line by line.
Full Bathroom Remodeling
We gut to the studs or the slab, replace water lines and drain runs as needed, reroute electrical if the original wiring is undersized, and build back with waterproofing that meets current code. Every rough-in gets inspected before walls close. You approve material selections before we order, so there’s no surprise upgrade charge at the end.
Small Bathroom Remodels
For half-baths and guest baths, we focus on the essentials: a new vanity, updated fixtures, fresh tile, and often a tub-to-shower conversion if space is tight. These projects in Hialeah Gardens often come in at the lower end of the pricing range, unless the slab hides a problem. Even on a small job, we camera-scope the drain before quoting.
Trusted Brands We Service in Hialeah Gardens
We install and service fixtures and materials from Kohler, Moen, KraftMaid, Cambria, and Silestone because those brands hold up in South Florida’s humidity. For Hialeah Gardens customers, we keep common replacement parts and trim kits stocked locally, so a mid-project fixture swap doesn’t stall the job for a week. When a homeowner wants a Cambria quartz vanity top or a Kohler shower system, we can usually have it specified and ordered within days, not weeks. We’ve also worked with homeowners using Sakrete for shower pan bases and Dvele for prefabricated components on larger builds, but we never push a brand that doesn’t fit the project.
See the difference
Before
After
Before
After
Before
AfterCommon Bathroom Remodeling Problems We See in Hialeah Gardens Homes
- Corroded cast-iron drain lines under slab-on-grade foundations. Homes built in Hialeah Gardens between the 1970s and 1990s often have original cast-iron waste lines that have rusted through at the trap or bell. Once the tile opens up, the repair is no longer optional, and if it wasn’t scoped beforehand, the change order hits hard.
- Root intrusion from mature ficus and oak trees. The city’s older neighborhoods have deep-rooted trees that find their way into clay or cast-iron sewer laterals. A camera scope before demo shows whether the line is clear or whether the bathroom remodel needs to include a drain replacement.
- Shallow water table complicating below-slab work. Hialeah Gardens sits close to the water table, which means below-slab plumbing repairs need proper bedding and sometimes a sump pump during the work. It’s part of why rough-in repairs here cost more than in cities with deeper, drier soil.
- Skipped permits and failed inspections. If a remodeler tells you a bathroom job doesn’t need a permit in Hialeah Gardens, they’re wrong. Rough-in plumbing and electrical must be inspected before walls close. We pull the permit, schedule the inspections, and pass them before we put a single tile back.
Pricing for Bathroom Remodeling in Hialeah Gardens, FL

Here’s what you should expect to pay for bathroom work in Hialeah Gardens, based on the jobs we’ve completed across the city.
| Project Type | Typical Cost in Hialeah Gardens |
|---|---|
| Bathroom Remodel | $9,000 – $28,000 |
| Small Bathroom Remodel | $5,000 – $12,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Shower Replacement | $3,000 – $8,500 |
| Bathroom Vanity Installation | $800 – $3,000 |
The two things that move the number most are what’s under the slab and what hardware you pick. A builder-grade vanity keeps you near the bottom of the range. A Cambria quartz top and a Kohler thermostatic shower system push you up. You’ll see every line item in your written price before we start, and if something changes mid-project, you approve the change order in writing first. Call (803) 680-2547 for a free estimate and a camera-scoped, written quote specific to your Hialeah Gardens home.
We Also Serve Cities Near Hialeah Gardens
Our Bathroom Remodeling in Hialeah Gardens crews also cover Miami, Hialeah, Miami Gardens, and Homestead for full bathroom remodels, walk-in showers, and tub-to-shower conversions. If you’re a few blocks over the city line, we’ll still come scope your drain and write you an honest price. Call (803) 680-2547 and tell us which neighborhood you’re in.
Serving Hialeah Gardens, FL - Our Local Coverage Area
We’re based in the Hialeah Gardens area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs About Bathroom Remodeling in Hialeah Gardens
Yes. If you’re changing plumbing, moving a drain, altering electrical, or replacing a shower valve, Hialeah Gardens requires a permit and a rough-in inspection before walls close. We pull the permit, schedule the inspection, and pass it before we finish the job. If a remodeler skips this step, you’ll be the one explaining it later.
Because the quote was written without looking at the drain line. In Hialeah Gardens, the most common change order is a below-slab drain repair discovered after demo. We camera-scope the line before we write your price, so if a repair is needed, it’s in the original quote or clearly flagged as a documented change order before you approve it. Call (803) 680-2547 to get an exact quote with no buried unknowns.
A typical full bathroom remodel in Hialeah Gardens takes 3 to 6 weeks from demo to final walkthrough, depending on whether we’re doing below-slab drain work and how many inspections the city requires. Small remodels and walk-in shower installations often finish in 2 to 3 weeks. We give you a written schedule before we start and update you if inspection timing shifts.
A walk-in shower installation in Hialeah Gardens runs $4,500 – $12,000. Keeping the drain in the same location keeps you at the lower end. Moving a drain on a slab, replacing corroded cast iron, or adding a custom glass enclosure moves you toward the top. Your written quote shows the exact breakdown before any work starts.
In most Hialeah Gardens bathrooms, yes. The tub’s existing drain location often works for a shower pan, which keeps the project in the $3,500 – $10,000 range. But the only way to know for sure is a camera scope of the drain line and a look at the slab. If the line is sound and the trap is in good shape, we build the shower on the existing footprint. If it’s not, we’ll show you the footage and price the repair as a change order.
Written by Isaac Pruett, Owner at Mason Remodeling, serving Hialeah Gardens since 2004.










