







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Bathroom Remodeling Across Florida City
Bathroom remodeling in Florida City typically runs $9,000 to $28,000 for a full gut-and-replace, and most projects take two to five weeks once the permit is issued. We work on single-story concrete-block homes every week, so we know what’s behind your walls before we open them. If you’re planning a remodel anywhere from NW 3rd Avenue over to Palm Drive, call Mason Remodeling at (803) 680-2547 for a written price before any work starts.
We’ve been remodeling bathrooms since 2004 as part of the Threshold Group family of home-service companies. Dispatch and scheduling for Florida City are coordinated from our Miami (South FL) office, and our crews serve Florida City locally. Every technician who walks through your door is background-checked, identity-verified, and introduced to you by name and photo before the visit.
Why Mason Remodeling Is Florida City’s Preferred Bathroom Remodeling Company

Florida City homeowners deal with a specific kind of house: single-story concrete block, built between the 1950s and 1970s, often with cast iron drain lines under the slab and venting that was never quite right. That’s not a problem for us. It’s the job. Our Bathroom Remodeling crews have opened enough of these walls to know what a Miami-Dade inspector will flag before the inspector even shows up.
The Threshold Standard is the reason homeowners choose us. Every crew member arrives in a clean marked uniform, shows a photo ID badge at the door, and has already been introduced to you by name and photo. You’ll know exactly who is coming before they ring the bell. We put the price in writing before we start, and we don’t change it unless you approve a change in writing first.
Isaac Pruett leads our team, and he holds every project to the same standard: written pricing, written guarantees, and a 365-Day Done Right Promise. If something isn’t right within a year of completion, we make it right at no cost to you. No dispute process. No conditions.
Styles & brands we work with







Bathroom Renovation in Florida City
A bathroom renovation in Florida City means working with block walls, slab-on-grade floors, and plumbing that’s often sixty years old or more. A full renovation typically runs $9,000 to $28,000 in this market, depending on how much of the rough plumbing and electrical has to be brought up to current code. We pull the permit, do the work, and clear the inspection. That’s the only way it’s done here.
What the Work Actually Involves
A full renovation starts with demolition down to the studs and slab. In a Florida City block house, that usually reveals cast iron drain lines that have been in the ground since the Eisenhower administration. We scope them, tell you honestly what needs replacing, and give you a written change order before we touch anything you didn’t approve.
Fixtures, Tile, and the Finish Layer
Once the rough work passes inspection, we set the shower pan, tile, vanity, and fixtures. We work with specification-grade materials including Kohler and Moen fixtures, and we can source Cambria or Silestone surfaces if you want a solid-surface vanity top. You get a written line-item quote before we order anything.
Small Bathroom Remodel in Florida City

A small bathroom remodel in Florida City usually runs $5,000 to $12,000, depending on whether we’re replacing the tub or shower, moving any plumbing, or just refreshing the surfaces. These are the guest baths, hall baths, and half baths in older Florida City homes. You may not have much square footage, but the plumbing and electrical requirements are the same as a big primary bath.
What You Can Do in a Small Space
We’ve done plenty of 5-by-8 baths in Florida City where the key move is a tub-to-shower conversion and a wall-hung vanity. It opens the floor visually and gives you a step-in shower without changing the footprint. The permit is the same; the work is just more contained.
Cost Drivers on Small Baths
The two things that move a small bath price are hidden drain work and bringing old wiring up to GFCI code. If your home still has ungrounded circuits, the inspector will require GFCI protection on the bathroom circuit before we can close the walls. That’s a real cost, and we’ll show it to you in writing before we start.
Trusted Brands We Service in Florida City
We service and install Kohler, Moen, Toto, and Grohe fixtures, and we stock common replacement parts for Florida City service calls so you’re not waiting on a shipped part. We’ve also worked on homes with prefab components from brands like Mighty Buildings and Dvele, where the plumbing rough-in and waterproofing details take a different approach. If you’ve got a spec from one of those manufacturers, we’ll review it line by line before we quote.
See the difference
Before
After
Before
After
Before
AfterCommon Bathroom Remodeling Problems We See in Florida City Homes
- Cast iron drain transitions. A tub-to-shower conversion opens the floor and exposes cast iron that has to be cut and transitioned to PVC. It’s a hidden condition, and we’ll tell you the cost the moment we see it, not bury it in the final bill.
- Exhaust fans vented into the attic. Too many Florida City bathrooms vent into the attic, and the humidity never leaves the house. We correct the terminus so drywall and paint actually cure, and your fan isn’t fighting South Florida moisture every day.
- Unpermitted prior remodels. When we pull a permit in Florida City, inspectors often require the existing bath to be brought into compliance before they’ll sign off the new scope. GFCI protection and proper venting are the two most common corrections.
- Slab moisture against flooring. Slab-on-grade construction means any flooring choice has to handle what comes up through the concrete. We spec the right underlayment and waterproofing for Florida City’s humidity cycle.
Pricing for Bathroom Remodeling in Florida City, FL
Here are the real numbers for Florida City. These are the ranges we quote, not a teaser to get you on the phone.
| Project | Florida City Price Range |
|---|---|
| Bathroom Remodel | $9,000 – $28,000 |
| Small Bathroom Remodel | $5,000 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Bathroom Vanity Installation | $800 – $3,000 |
What moves the price? Drain line condition, electrical upgrades, waterproofing method, and fixture grade. We give you a written line-item price before any work starts, and we don’t change it unless you sign off on a change. Call (803) 680-2547 for a free estimate on your Florida City bathroom.
We Also Serve Cities Near Florida City
Mason Remodeling provides Bathroom Remodeling in Florida City and the surrounding South FL communities. You’ll find us working in Miami, Hialeah, Miami Gardens, and Homestead as well. If you’re close to the Florida City line but in a neighboring zip, call us and we’ll confirm coverage for your street.
Serving Florida City, FL - Our Local Coverage Area
We’re based in the Florida City area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs About Bathroom Remodeling in Florida City
Yes, even a fixture swap can trigger a permit requirement in Florida City if you’re touching the drain, valve, or electrical. A one-for-one toilet swap usually doesn’t, but anything involving the shower valve, tub drain, or moving a fixture will. We pull the permit and clear the inspection, so you’re never left holding the paperwork. Call (803) 680-2547 and we’ll tell you exactly what your scope needs.
Expect $5,000 to $12,000 in Florida City, with the spread driven by hidden conditions like cast iron drain work, GFCI upgrades, and waterproofing method. A hall bath with a direct tub-to-shower swap often lands around $7,000 to $9,000 once the permit and inspection are included. We’ll write you a fixed price before we start. Call (803) 680-2547 for an exact quote.
Yes, and we do it regularly. The challenge is the cast iron drain under the slab, which often needs to be cut and transitioned to PVC. We’ll scope it before we quote, and if we find something unexpected when the floor is open, you’ll get a written change order before any additional work. The rough-in work is the same as the original tub drain in most cases. Call (803) 680-2547 to schedule your free estimate.
Most Florida City bathroom remodels run two to five weeks from demo to final inspection. The permit review is usually the slowest part of the schedule. We coordinate the inspection dates so your bathroom isn’t left open longer than it needs to be. You’ll get a written schedule with your written price.
Your neighbor may have done a surface refresh without a permit, or skipped the drain work that was actually needed. It’s also possible they had a different waterproofing method or lower-grade fixtures. We quote line by line, so you can compare what’s actually in the scope. If someone’s number looks low, ask what they’re not pulling a permit for. That’s usually the answer. Call (803) 680-2547 and we’ll walk you through our written estimate.
Written by Isaac Pruett, Owner at Mason Remodeling, serving Florida City since 2004.










