







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Bathroom Remodeling Across Banning
Bathroom remodeling in Banning typically runs $9,000 to $28,000 for a full gut-and-rebuild, with smaller bathrooms landing between $5,000 and $12,000. Most projects we take on in Banning are completed on a clear written schedule, not an open-ended timeline. We know the housing stock here, from 1960s ranch homes off West Ramsey Street to newer builds in the Sun Lakes community, and we plan the work around the San Gorgonio Pass wind conditions that most remodelers never account for. If you’re weighing a remodel and want honest numbers before you commit, call (803) 680-2547 for a free estimate.
Why Mason Remodeling Is Banning’s Preferred Bathroom Remodeling Company

Banning homeowners tend to ask the same three questions before anyone touches a wall: who is showing up, what does it cost in writing, and what happens if something isn’t right. We answer all three before the first tool comes off the truck. Every crew member assigned to a Banning job is background-checked and identity-verified under the Threshold Standard. You receive the technician’s name and photo before the visit, and they arrive in a clean marked uniform with a photo ID badge at the door. No exceptions.
The price is written. Not estimated. Not ballparked. A line-item scope of work, with allowances for fixtures, tile, and valves, delivered before demolition day. Our 365-Day Done Right Promise covers the finished work for a full year from the completion date. If something fails, we return and make it right at no charge. That’s the same standard across our Bathroom Remodeling division, and it’s why Banning homeowners who have been burned by verbal estimates call us second.
Styles & brands we work with







Bathroom Remodeling Contractor in Banning
A bathroom remodeling contractor in Banning handles everything from the first plumbing inspection to the final caulk line. That means scoping the existing drain lines, setting the waterproofing detail, pulling the permit, managing the trades, and keeping the finish schedule on track so your tile, vanity, and fixtures arrive in the right order. When a Banning homeowner calls us, they’re usually looking at a space that hasn’t been touched in 20 or 30 years, often with original cast-iron drains and a layout that no longer works for how the household actually lives. The work typically runs $9,000 to $28,000 depending on square footage, plumbing condition, and finish level.
Scope and Permitting
Banning requires permits for any bathroom remodel that moves plumbing, alters the drain-waste-vent system, or changes the electrical layout. We pull the permit, schedule the inspections, and don’t ask you to meet an inspector alone. If the project is cosmetic only, a permit may not be required, and we’ll tell you that plainly before you spend a dollar.
Fixed Allowances Before Demo
The most common Banning bathroom remodel mistake is leaving tile and fixture allowances loose. You pick a $400 vanity faucet and a $900 shower valve and suddenly the finish schedule is $1,800 over budget. We set the allowances with you during the design walkthrough and write every selection into the scope of work before a hammer swings. Change orders still happen if we find a failed drain or rotted subfloor, but they’re discussed and priced in writing, not slipped onto the final invoice.
Walk In Shower in Banning

A walk in shower in Banning replaces the traditional tub-and-surround with a curbless or low-curb shower that’s easier to enter and dramatically changes the feel of the room. For older adults in communities like Sun Lakes Country Club, a walk-in shower is often the difference between staying in the home and downsizing. For families off Highland Springs Avenue, it’s about getting two kids through the morning without fighting for tub time. Walk-in shower installation in Banning runs $4,500 to $12,000, while a tub-to-shower conversion lands between $3,500 and $10,000.
Waterproofing and Wind Detail
Banning sits in the San Gorgonio Pass wind corridor, and that fact should change how your shower wall is built. We detail the shower surround, the vent termination, and the roof-to-wall flashing above the bath for wind-driven rain, not the still-air assumptions used in a typical inland California spec. That means a continuous waterproofing membrane behind the tile, not just cement board and hope.
Glass and Threshold Choices
Frameless glass enclosures are popular in Banning remodels, and they’re specified to handle the temperature swings between winter mornings and August afternoons without binding. For curbless showers, we slope the floor correctly and install a linear drain so water stays where it belongs. Every choice is priced in writing before we order a single panel.
Trusted Brands We Service in Banning
We install and service specification-grade products from Kohler, Moen, Cambria, Silestone, KraftMaid, and Wellborn. For Banning customers, that means you’re not limited to whatever the big-box store has on the shelf this week. We coordinate the order, verify lead times, and have the materials staged before demolition so your project doesn’t stall waiting for a vanity. If you’ve been looking at prefab ADU packages from companies like Abodu or Cover as part of a larger property plan, we can integrate bathroom rough-ins and finish work into that scope when it makes sense. Most Banning remodels we do use a combination of Kohler fixtures, a Wellborn or KraftMaid vanity, and Cambria or Silestone tops, depending on your budget and the look you’re after.
See the difference
Before
After
Before
After
Before
AfterCommon Bathroom Remodeling Problems We See in Banning Homes
- Wind-driven rain behind shower surrounds. Banning’s position in the San Gorgonio Pass means routine gusts push water into wall penetrations that would stay dry in Redlands or Beaumont. When we open a leaking surround, the damage is usually at the vent termination or the top edge of the surround, not the base. That’s why we flash and membrane those areas differently on Banning jobs.
- Rotted subfloor at the toilet flange. On a 1960s ranch house off West Ramsey Street, we opened the hall bath and found the subfloor soft from decades of a slowly weeping wax ring. The homeowner had planned for cosmetic updates; what we actually did was replace the plywood, keep the existing drain rough-in, and dry-fit a Kohler highline toilet before the tile went down. We wrote every selection, including the Wellborn vanity, Cambria top, and Moen trim, into the scope of work before demolition day so no change order surfaced mid-tile.
- Cast-iron and galvanized drains that fail when you touch them. Banning’s older housing stock, especially the 1950s and 1960s builds, still has original drain lines that look fine until they’re exposed. We scope the drains during the design phase, not after demo, so if a re-pipe is needed, it’s in the written estimate from day one.
- Loose allowances that blow the budget. We set firm fixture and tile allowances before demo and write them into the scope of work. If you want a $1,200 Toto toilet instead of the $400 allowance, that’s fine, but it’s a decision you make knowingly, not a surprise on the final invoice.
Pricing for Bathroom Remodeling in Banning, CA
Here’s what you’re actually paying for in Banning, and what each piece costs.
| Project | Typical Banning Range |
|---|---|
| Full Bathroom Remodel | $9,000 – $28,000 |
| Small Bathroom Remodel | $5,000 – $12,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Shower Replacement | $3,000 – $8,500 |
| Bathroom Vanity Installation | $800 – $3,000 |
What moves the number: the condition of the existing drain lines, whether you’re moving plumbing or keeping the current rough-in, the square footage, and the finish level you choose. Kraus and Moen faucets cost different money. A pre-fab shower pan costs different money than a custom mud-set tile floor. We’ll walk you through every dollar during the estimate. Call (803) 680-2547 for a written price, free.
We Also Serve Cities Near Banning
Mason Remodeling serves Banning and the surrounding communities, including Beaumont, Calimesa, San Jacinto, and Yucaipa. Scheduling and dispatch are coordinated from our Inland Empire office, and crews work locally in Banning on a regular basis. If you’re just outside the city line, call and ask, we’ll give you a straight answer.
Serving Banning, CA - Our Local Coverage Area
We’re based in the Banning area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs About Bathroom Remodeling in Banning
Yes, if the project moves plumbing, changes the drain-waste-vent system, or alters electrical wiring, you need a permit from the city of Banning. Cosmetic-only work like paint, vanity replacement without plumbing changes, or new light fixtures on existing boxes usually doesn’t require one. We handle the permit, schedule the inspections, and make sure every inspection passes before we close the walls. Call (803) 680-2547 and we’ll tell you exactly which permit path applies to your project.
Most Banning bathroom remodels take three to six weeks from demolition to final walkthrough, depending on scope. A straightforward tub-to-shower conversion with no plumbing relocation can finish in two to three weeks. A full gut with drain replacement, new electrical, and custom tile work runs longer. We give you a written calendar before we start, and we update it if a material lead time changes.
A walk-in shower installation in Banning runs $4,500 to $12,000. That includes demolition, waterproofing, the shower valve, pan or mud-set floor, tile or surround, and glass enclosure if included. The variables are the size of the shower, the tile selection, and whether you need custom glass. For an exact number, call (803) 680-2547, estimates are free and written.
Three things, mostly: failed drain lines under older Banning homes, water damage hidden behind the existing surround, and homeowner finish selections that exceed the original allowance. We price the first two into your written estimate whenever possible by scoping before demo, and we set firm allowances for the third. Any change order is priced in writing and approved by you before the work happens.
No. A real bathroom remodel that meets code and holds up to Banning’s wind conditions takes weeks, not hours. Anyone claiming a one-day full bathroom remodel is cutting waterproofing or permit corners. We handle planned remodels on a written schedule. For a realistic timeline on your project, call (803) 680-2547.
Written by Isaac Pruett, Owner at Mason Remodeling, serving Banning and the surrounding Inland Empire communities.










