A new rear addition with a vaulted beamed ceiling and tall windows

IKO Home Additions & ADU Nationwide

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansProudly serving local communities 22+ years
A wide opening with a new beam where the kitchen wall was removed
A garage converted into a guest room and home office
A finished basement family room with a media wall and wet bar
A walk-in pantry with wood shelving
A powder room with botanical wallpaper and a stone sink
A remodeled laundry and mudroom with a bench, cubbies and painted cabinets
A built-in window seat in a bay window
A dining nook with a built-in banquette
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as$199/month*On approved credit; ask for current terms
Get your free estimate

IKO Home Additions & ADU: The Los Angeles Owner’s Guide

We stock and install IKO-compatible materials for home additions and ADU construction across Los Angeles, and a full addition or ADU build typically runs $53,100 to $153,400 depending on square footage, site prep, and finish level. Most owners realize they need professional help when their existing IKO roofing, waterproofing, or structural sheathing starts failing around the addition’s roofline, causing leaks, sagging, or visible delamination at the seams. We’re an independent contractor, not affiliated with IKO, which means we match the right material to your existing build rather than pushing one brand line.

Call (803) 680-2547

What you’re likely dealing with: water intrusion at the transition point where an old roofline meets a newer addition, failed flashing around dormers or bump-outs, or sheathing that has absorbed moisture and lost its structural rating. Isaac Pruett has seen all of it during nearly two decades of Los Angeles remodels, and the fix usually starts with understanding exactly which IKO product line was used and how it was installed.

Key Takeaways

  • Installed cost for a home addition or ADU in Los Angeles: $53,100 – $153,400
  • We match IKO materials to your existing roofline, flashing, and sheathing before work begins
  • Written price delivered before any work starts, on every project
  • Every completed job carries a written guarantee with clearly stated terms
  • Call (803) 680-2547 for a free estimate on your IKO-related addition or ADU project

Which IKO Models This Applies To

A single-story rear room addition with tall windows and a new patio

IKO manufactures a range of asphalt shingles, underlayment, and waterproofing membranes commonly used on Los Angeles home additions and ADUs. The most common lines we encounter on addition work are the IKO Cambridge architectural shingle series and the IKO Dynasty line, along with IKO’s StormShield and AquaBarrier underlayments used at transition points. Compatibility gets tricky because IKO changed some shingle dimensions and sealant strip configurations between production years, so a Cambridge shingle from 2018 will not always lock correctly against a Cambridge batch from 2024.

We identify the exact material by pulling a shingle sample and checking the manufacturing code on the back of the sheet, then measuring the exposure and sealant strip width. For additions where the original roof is older, we often find the original IKO line has been discontinued or reformulated, which is where a quality aftermarket equivalent from GAF, CertainTeed, or Owens Corning sometimes makes more sense than forcing a mismatched IKO product. That decision is made on the roof, with a written recommendation, not in a showroom. We also stock and install complementary systems from KraftMaid for cabinetry and Cambria or Silestone for countertops on ADU interior finishes.

Explore

Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Signs Your IKO Home Additions & ADU Is Failing

  • Ceiling staining at the addition’s roofline. The most common first sign. Water is getting past the flashing or underlayment where the new roof ties into the original structure, and it follows the truss line until it shows up inside.
  • Granule loss in gutters or downspouts. IKO shingles shed granules as they age, and in Los Angeles heat cycles the asphalt layer breaks down faster than in cooler climates. If you see heavy granule buildup, the shingle has entered the back half of its life.
  • Wavy or lifting shingles along the ridge or transition lines. This usually means the sealant strip has failed and wind is getting underneath. On Los Angeles hillside lots, the afternoon wind off the canyons accelerates this once it starts.
  • Damp or soft sheathing in the attic near the new framing. By the time you can feel it, the IKO underlayment has been compromised for months. The sheathing likely needs replacement, not just the surface layer.
  • Cracking or peeling at interior seams where the addition meets original walls. Movement between the old foundation and the new addition can telegraph through drywall and trim. It’s not always a roof issue, but it often shows up at the same time and needs to be addressed before new materials go on.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Replacement Cost & What’s Included

A second-story addition that matches the existing roofline

A full home addition in Los Angeles currently runs $53,100 to $153,400, and an ADU construction project spans $106,200 to $259,600 depending on whether you’re building detached, attached, or converting a garage. Lower-end numbers cover straightforward builds with standard IKO shingles, basic finishes, and a simple foundation. Upper-end pricing reflects site grading challenges, hillside engineering, custom cabinetry, and higher-spec materials like Cambria or Silestone countertops.

Every quote includes all material, labor, fasteners, flashing, underlayment, sheathing replacement where needed, and any haul-off of the old material. You get a written price before any work starts, and that price does not move unless you change the scope. Every job carries a written guarantee stating exactly what is covered and for how long, starting from the completion date. If a repair or installation fails, we return free of charge. No dispute process, no conditions.

What Drives the Price Range

  • Structural scope: A simple bump-out costs less than a full second-story addition that requires engineered beams and foundation work.
  • Site access: Hillside lots, narrow streets, or limited staging areas in neighborhoods like Silver Lake, Echo Park, or Mount Washington add labor hours and equipment needs.
  • Finish level: Builder-grade fixtures versus specification-grade products from Kohler, Moen, Toto, and Grohe. The gap is real and it shows up in the final number.
  • Roof integration: Matching IKO materials to an existing roofline, or replacing the entire roof if the old material is too far gone, moves the price meaningfully.
  • Permit and plan costs: Los Angeles requires plans, structural calculations, and inspections for additions and ADUs. We pull permits and manage the inspection process as part of the scope.

DIY or Call Us?

If you want to understand the scope, you can safely check a few things yourself: look at the shingle edges along the addition’s roofline for curling or lifting, check gutters for granule buildup, and look for staining in the attic near the transition point. That’s a useful starting point before you call. But the actual repair or rebuild is not a weekend project. Roof work at height, structural framing, foundation ties, and IKO material matching all carry real risk, and a wrong step on a steep Los Angeles hillside roof turns expensive into dangerous.

If you’re dealing with a failed roofline transition, cracked framing, or water intrusion inside the addition, call us at (803) 680-2547. We’ll put eyes on the actual condition, give you a written price, and if work isn’t needed, we’ll tell you that too. Know who’s coming, know what it costs, know it’s backed up. Everything else is just noise.

FAQs

A finished backyard cottage with a small covered porch

Getting started with Mason

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Find your local team

Each location is independently owned and works to the same written standard. Enter your ZIP code to reach yours.

A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help nationwide? Licensed & insured · Free in-home estimates response · free estimates
Call (803) 680-2547
Areas We Serve

Request a Free Estimate

Tell us what you need - Mason Remodeling responds fast. No obligation.

By sending this request, you accept our Privacy Policy and agree to be contacted via phone, email, or SMS about your request, including by the independent professionals who may fulfill it.

Prefer to text? Text Us
Call Now - 24/7 Dispatch